Ongropack warehouse hall
Technical data
Project
Ongropack warehouse hall
Location
Szirmabesenyő
Programme
Logistics park expansion, warehouse hall and covered open sided storage
Total usable area
7,890 m²
Category
Logistics facilities
Handover date
2024
Project managers
Máté Biró
Staff
Dóra Pelczer
Kristóf Tuli
Commissioned by a long-standing partner, we designed a new warehouse building and a covered open-sided storage structure. The plastic film manufacturing, processing and trading facility expanded its storage capacity through the construction of these two new buildings. The development scope was defined by the expansion potential of a newly designated plot within the existing site.